Phase 5 · Write and submit
Making your application
What goes in, in what order, and the administrative details that hold applications up.
Who this is for:Candidates at any stage
The application is one PDF. Assembling it is a project in itself, and most of the delays are administrative rather than technical.
What the application must contain
Institution of Civil Engineers
- A completed review application form.
- Evidence of educational qualifications — if you are a non-member, or ICE does not already hold them.
- Evidence of IPD completion.
- A two-page CV.
- A Professional Review report with appendices.
- CPD records.
- Evidence of individual requirements, if applicable.
- The application fee must be paid before you upload, and it is non-refundable.
- The application must be a single PDF no greater than 15 MB. Convert documents to PDF electronically rather than scanning where possible, use an appropriate font size — ICE gives Arial 11 as an example — and make sure the PDF is printable and can be read in black and white.
- Application file size
- 15MB, one PDFA single PDF. Convert documents to PDF electronically rather than scanning where you can, and check it reads in black and white.
- CV length
- 2pagesOutside the report word count.
- Professional Review report length
- 5000words of body textBody text only. Contents pages, tables of figures, lists of abbreviations, appendices, the CV and CPD records are outside the count.
- Appendices — A3 sides
- 3sides of A3
- Appendices — A4 sides
- 12sides of A4CPD records sit outside this limit.
From Incorporated and Chartered Professional Review Guidance, Institution of Civil Engineers.
Where it goes
Civil engineering candidates submit through the Professional Reviews upload portal. Infrastructure engineering candidates send the application by email to ICE's infrastructure address. Both routes are given in the current Professional Review Guidance, along with the telephone number for portal problems.
Before you upload, you must confirm that both your sponsors have submitted their statement of support, and that every item on ICE's own application checklist is included. That confirmation is your responsibility, not your sponsors'.
What happens after you upload
Immediately
An automated on-screen response confirms the upload
If you do not see it, contact the Professional Reviews team rather than assuming.
Within 10 working days
ICE checks your application for completeness and acknowledges it
If something is missing you have 48 hours to provide it, and processing stops until it arrives. This is why the checklist matters.
After acknowledgement
Your name is published on the ICE website for at least 28 days
In accordance with Admission Procedure 3.
About 4 weeks before the review
Your notification letter arrives
It gives the date and time, the names of your reviewers, and the timing of your Communication Task. Check immediately for any conflict of interest and tell ICE if there is one. Never contact a reviewer directly.
Before the review
Your reviewers pre-assess your report
If they agree it is not of a satisfactory standard, your review is deferred, you are told why and what to do, and the review is rearranged once you have addressed the comments.
Details on the form that matter more than they look
Expertise and employment type. You select one from each list. ICE uses these to match you with reviewers, so an inaccurate selection can put you in front of someone whose background does not fit your work.
Infrastructure engineering description. Infrastructure candidates also select an engineering description and provide a brief summary of their report, again to help ICE match reviewers.
Individual requirements. These must be stated when you apply, with any supporting evidence, not raised later. See reasonable adjustments.
Unspent convictions. ICE's admission rules deal with this specifically. If you have an unspent conviction relating to a serious criminal offence, there is a criminal convictions form which must also be signed by your sponsors and submitted with your application; a member of staff will then contact you directly and in confidence.
Publication of your name. There is a tick box. If you tick it and you are successful, your name is published on the ICE website five days after your result is issued, and subsequently appears on the New Civil Engineer website.
Related pages and tools
- Application plannerWork backwards from your target review: tasks, dependencies, your own confirmed dates, and what is blocking what.
- SponsorsWho can sponsor you, what the lead sponsor's role actually involves, and how to approach both without leaving it late.
- CVWhat the CV is for in a Professional Review, what reviewers read it for, and how to fit a career into two pages.
- The report5,000 words in which two strangers have to see your competence: what ICE asks for, how to structure it, and how to edit it.
- AppendicesChoosing evidence that shows your involvement, staying within the limits, and making it legible.
- Submission checkThe last pass before you upload, covering the things that get applications returned.