Phase 5 · Write and submit

Appendices

Choosing evidence that shows your involvement, staying within the limits, and making it legible.

Who this is for:Candidates at any stage

Appendices exist to show reviewers your actual work. They are also the most common place for candidates to lose marks quietly — by including material that does not show their involvement.

The limits and the rules

Institution of Civil Engineers

  • Supporting documentation such as numerical analyses, cost data, drawings or other relevant evidence from your work should be included as appendices to support the content in your report.
  • Appendices are not included in the word count.
  • Your appendices should include no more than 3 sides of A3 and 12 sides of A4.
  • Include hyperlinks linking the appendices with the relevant text in the main body of the report, and back — and they should not link to documents outside your application.
  • Use colour where necessary — for example, images and drawings.
  • CPD records are not included within the appendix page limits.
Appendices — A3 sides
3sides of A3
Appendices — A4 sides
12sides of A4CPD records sit outside this limit.
Application file size
15MB, one PDFA single PDF. Convert documents to PDF electronically rather than scanning where you can, and check it reads in black and white.

From Incorporated and Chartered Professional Review Guidance, Institution of Civil Engineers.

The test for including something

One question: does this show what I did?

A general arrangement drawing produced by someone else, of a structure you worked on, shows that the structure exists. A marked-up extract of the same drawing showing the detail you changed, with your annotation of why, shows what you did.

That distinction decides most appendix selections. Reviewers will ask you about anything in the appendices, and being asked to talk through a calculation you did not do is an uncomfortable fifteen minutes.

Annotation is what makes it evidence

Almost every appendix benefits from a short annotation: what this is, what your involvement was, and what to look at. Two lines. Without it, a reviewer sees a drawing; with it, they see a decision.

What tends to work

TypeWorks whenDoes not work when
CalculationsIt is your calculation, extracted to the page that contains the judgement, with your annotation of the assumption that mattered.It is twelve pages of software output with no indication of what you decided.
DrawingsMarked up to show your change, your comment, or the detail you developed.A full GA at A3 that shows the scheme rather than your contribution.
ProgrammesExtracted to the part you built or the decision point you managed, with a note of what changed and why.A full project programme, unreadable at A4.
Risk materialA designer's risk register entry you wrote, or a risk assessment you changed, with the before and after.The project risk register, with your name nowhere in it.
Commercial evidenceA cost forecast you produced, or a change assessment you wrote — anonymised or redacted as needed.Anything you were not authorised to share.
PhotographsShowing something specific you are describing — a defect, a temporary works arrangement, a completed detail.General site photography, or anything revealing a security-sensitive location.