A site, a function, a constraint and a piece of ground. Everything after that is the exercise.

What a brief gives you, and what it withholds

Each brief here carries four things: what the client wants, the constraint that should decide between your schemes, the ground, and — where the brief offers one — a reuse opportunity.

That is deliberately all. The examination gives you more words but not much more information, and the skill being practised is extracting the governing constraint from what you are given and building a scheme around it.

Every brief also carries a note on what makes it hard, hidden until you open it. Read that after your attempt, not before. If your two schemes did not engage with the difficulty it names, that is the lesson.

Working through them

Rotate the building type. Candidates who only practise on the structure they design at work are practising the thing they are already good at.

They are original

None of these is taken from, adapted from, or derived from the Institution's examination archive — its question papers, its examiners' reports, its published worked answers — or from a commercial course. No examination drawing has been traced. That material is the Institution's, and it is the Institution you should obtain it from, under its own terms.

Practice examination briefs

77 original briefs. Each gives you a site, a function, a constraint and a piece of ground — everything else is the exercise.

Briefs you have attempted0 of 35
  • Sixth-form teaching block on a constrained urban site

    building

    A three-storey teaching block of 2,400 m² gross, with eight classrooms per floor, a double-height entrance atrium at the north end, and a plant enclosure at roof level. Clear floor-to-ceiling height 2.9 m throughout. The building must be in use for the September intake twenty months from now.

    Constraint
    The only vehicular access is a single 3.2 m gate onto a residential street, with a weekday delivery embargo between 08:00 and 09:30 and after 15:00.
    Ground and site
    Made ground to 2.5 m over stiff clay with an allowable bearing pressure of 150 kN/m² at 3.0 m depth. Groundwater not encountered to 8 m.
  • Two-span road bridge over a tidal creek

    bridge

    A two-lane highway bridge carrying a 7.3 m carriageway and two 2.0 m footways over a tidal creek, total span between abutments 54 m. A single intermediate support is permitted but must sit clear of the low-water channel.

    Constraint
    The creek is a designated habitat. No works below mean high water may take place between October and March, and no permanent works may narrow the low-water channel.
    Ground and site
    Soft alluvium to 9 m over dense sand and gravel. Groundwater at 1 m, tidal range 4.2 m.
  • Cold store extension to an operating distribution centre

    industrial

    A 4,500 m² single-storey cold store at −25 °C, clear internal height 12.5 m, adjoining an existing ambient warehouse which must remain in operation throughout. Racking loads up to 55 kN per leg on a 1.2 m grid.

    Constraint
    The existing warehouse cannot close. The shared wall must be maintained weathertight and secure at all times, and no work may take place inside the operating building during trading hours.
    Ground and site
    Firm sandy clay, allowable bearing pressure 120 kN/m² at 1.5 m. Existing pad foundations at 1.8 m along the shared elevation.
  • Public library with a long-span reading room

    civic

    A two-storey library of 3,100 m². The first-floor reading room requires a column-free space 24 m × 30 m with a 6.0 m clear height and top light. Book stacks at ground floor impose 7.5 kN/m².

    Constraint
    The building sits in a conservation area with a 12.5 m height limit to the top of any parapet, measured from the adjoining pavement.
    Ground and site
    Weathered mudstone at 2.0 m, allowable bearing pressure 300 kN/m². No groundwater to 6 m.
  • Vertical extension to a 1960s office frame

    refurbishment

    Add two storeys to an existing six-storey reinforced concrete framed office, and remove two internal columns at ground floor to form a new entrance. Existing floor loading 3.0 kN/m² imposed; new floors to match.

    Constraint
    The existing building must remain occupied on floors one to four throughout. The original drawings survive but no reinforcement schedules do.
    Ground and site
    Existing pad foundations on dense gravel, 2.4 m below ground. No records of pile or pad dimensions.
    Reuse opportunity
    Retaining the existing frame is the low-carbon option, but its capacity must be established rather than assumed.
  • Bus interchange canopy over a live bus station

    transport

    A canopy covering eight bus stands, 68 m × 22 m on plan, with a minimum 4.8 m clearance to underside over the running lanes and a supported passenger information gantry along one edge.

    Constraint
    The bus station must remain operational. No more than two stands may be out of service at any time, and no work may take place over a live running lane.
    Ground and site
    Existing reinforced concrete slab over made ground; ground investigation shows soft silty clay to 6 m over stiff clay.
  • Rooftop plant enclosure and screen on an existing hospital

    building

    A new plant deck of 900 m² and a 4.0 m high acoustic screen at roof level on a five-storey hospital wing, supporting chillers up to 8 tonnes each and a 3 tonne air handling unit, with maintenance access to all plant.

    Constraint
    The hospital operates continuously. Vibration and noise transmission to the wards below are limited, and no crane may oversail the adjacent accident and emergency entrance.
    Ground and site
    Not applicable at roof level, but existing column loads must be checked to foundation. Existing piles, records incomplete.
  • Small-craft pontoon and access bridge

    marine

    A floating pontoon 60 m × 4 m serving 24 berths, with a hinged access bridge from a fixed quay. Tidal range 5.5 m. Pedestrian loading 4.0 kN/m² and a design gradient no steeper than 1 in 8 at any tide state.

    Constraint
    The quay wall is a listed masonry structure and may not carry new horizontal load. All restraint must be taken by new elements.
    Ground and site
    Silty sand to 12 m over rock. Water depth 3.5 m at mean low water.
  • Mixed-use block over a retained basement

    building

    A seven-storey building with retail at ground, offices on floors one to three and residential above, on the footprint of a demolished department store whose two-level basement is to be retained and reused for parking and plant.

    Constraint
    The retained basement retaining walls were designed for a two-storey building. Column positions in the basement cannot move.
    Ground and site
    Existing basement slab at 6.5 m below ground on stiff clay. Groundwater at 4.0 m, currently controlled by an existing drainage system of unknown condition.
    Reuse opportunity
    Reusing the basement avoids a very large excavation and the associated carbon, provided the retaining structure can be shown to be adequate.
  • Grain store with a travelling conveyor

    industrial

    A 40 m × 90 m grain store with 8 m high retaining bays internally, a travelling overhead conveyor on a 60 m runway, and clear internal height 14 m to underside of roof structure. Stored grain 8.5 kN/m³.

    Constraint
    The store must be emptied and filled by front loader, so no internal columns are permitted within the storage area.
    Ground and site
    Firm to stiff clay, allowable bearing pressure 150 kN/m² at 1.2 m. Slight fall across the site of 1 in 40.
  • Footbridge over a live railway

    bridge

    A pedestrian and cycle bridge with a clear span of 38 m over four electrified tracks, with ramped approaches at 1 in 20 and a minimum clearance of 5.8 m above rail level.

    Constraint
    Track possessions are limited to two eight-hour night windows, six weeks apart. Nothing may remain over the track outside a possession.
    Ground and site
    Railway embankment of made ground to 5 m over firm clay. Foundations must not surcharge the embankment slope.
  • Sports hall with a spectator gallery

    civic

    A four-court sports hall 34 m × 20 m clear, 9.0 m clear height to underside of any structure, with a 120-seat spectator gallery along one long side at 3.5 m above floor level and a plant room beneath it.

    Constraint
    The site is bounded on the gallery side by a 3 m easement over a live foul sewer at 2.8 m depth, which may not be built over or surcharged.
    Ground and site
    Loose to medium dense sand to 4 m over dense sand. Groundwater at 3.5 m.
  • Data hall extension with heavy floor loading

    building

    A single-storey data hall of 1,800 m² with 15 kN/m² floor loading, a 1.2 m raised access floor, external plant yard, and a 3.5 m deep service void above the equipment with independent support for cable trays and cooling.

    Constraint
    Deflection under service load must not exceed 10 mm at any point of the equipment floor, and differential settlement between any two racks must not exceed 5 mm.
    Ground and site
    Variable made ground 1.5 to 4.0 m deep over firm clay. Historical mapping shows a filled watercourse crossing the site diagonally.
  • Church hall conversion with a new mezzanine

    refurbishment

    Insert a 220 m² mezzanine into a Victorian church hall with masonry walls and a timber king-post roof, creating meeting rooms above and retaining the hall below. New imposed loading 4.0 kN/m².

    Constraint
    The building is listed. No new structure may be fixed to the roof trusses, and the internal face of the masonry may not be disturbed above 2.0 m.
    Ground and site
    Existing strip footings 0.6 m wide at 0.9 m depth on firm clay, condition unknown.
    Reuse opportunity
    The whole scheme is a reuse exercise; the carbon case rests on not replacing the building.
  • Multi-storey car park with a photovoltaic roof

    transport

    A four-deck car park providing 420 spaces, with a photovoltaic array over the top deck on a supporting structure giving 2.4 m clearance, and a lift and stair core at each end.

    Constraint
    The deck-to-deck height is limited to 2.9 m by a planning condition on overall height, and the internal layout must achieve a 6.0 m aisle with 2.4 m clear headroom throughout.
    Ground and site
    Dense gravel from 1.0 m, allowable bearing pressure 250 kN/m².
  • Water treatment tank and access structure

    industrial

    A rectangular reinforced concrete process tank 22 m × 14 m × 6.0 m deep, half buried, with an access gantry across the top, a launder channel along one side, and provision for a future second tank alongside.

    Constraint
    The tank must remain watertight to a specified leakage class, and must be capable of being emptied for inspection at any time with the surrounding ground fully saturated.
    Ground and site
    Soft clay to 5 m over stiff clay. Groundwater at 1.2 m, artesian pressure not encountered.
  • Laboratory building with vibration-sensitive equipment

    building

    A three-storey research building of 4,000 m², with electron microscopy suites at ground floor requiring a vibration criterion of VC-D, general laboratories above, and a rooftop plant deck.

    Constraint
    A four-lane road runs 18 m from the microscopy suite, and the site is 400 m from a working quarry with permitted blasting twice weekly.
    Ground and site
    Stiff clay to 12 m over weathered rock. Groundwater at 5 m.
  • Farm accommodation bridge over a new dual carriageway

    bridge

    A single-span accommodation bridge carrying agricultural vehicles up to 30 tonnes over a new dual carriageway in cutting, clear span 32 m, with a 4.5 m wide deck and parapets to the required containment level.

    Constraint
    The carriageway below must be constructed after the bridge, so the bridge must be built over an open cutting with no traffic management constraint, but the cutting slopes are only stable at 1 in 2.5.
    Ground and site
    Glacial till, allowable bearing pressure 200 kN/m² at 2.0 m below formation level.
  • Visitor centre partially cut into a hillside

    civic

    A single-storey visitor centre of 1,200 m² set into a hillside, with a green roof, a fully glazed elevation facing the valley, and an exhibition space requiring a 14 m clear span parallel to the glazing.

    Constraint
    The retained height at the rear varies from 1.5 m to 5.5 m along the length of the building, and no permanent ground anchors may extend beyond the site boundary 4 m behind the retaining line.
    Ground and site
    Weathered sandstone with clay bands, dipping towards the valley at 15°.
  • Modular residential block on a podium

    building

    A six-storey residential building of volumetric modules over a two-storey in-situ podium containing retail and parking, with a transfer structure at second-floor level. 84 apartments.

    Constraint
    The podium column grid is set by the parking layout at 7.8 m × 5.2 m; the module width is 3.6 m and cannot change.
    Ground and site
    Firm clay, allowable bearing pressure 150 kN/m² at 2.0 m.
  • Bulk material silo group

    industrial

    Four cylindrical silos, each 9 m diameter and 22 m high, on a common elevated support structure with a discharge floor 6.0 m above ground, filled by an overhead conveyor. Stored material 14 kN/m³.

    Constraint
    Silos must be capable of being filled and emptied independently and in any combination.
    Ground and site
    Dense sand and gravel from 2.0 m, allowable bearing pressure 300 kN/m².
  • Mill building converted to apartments

    refurbishment

    Convert a four-storey stone-walled former mill with cast-iron columns and timber floors into 32 apartments, inserting new floors where the existing cannot meet loading, and forming a new stair and lift core.

    Constraint
    The cast-iron columns are to be retained and expressed. Their capacity is unknown and no records exist.
    Ground and site
    Existing stone strip footings at 1.2 m on firm clay. The building is 6 m from a canal.
    Reuse opportunity
    The retained structure is the carbon case, but each retained element needs its own justification.
  • Station footbridge with lift towers

    transport

    A footbridge linking two platforms with a 26 m clear span over three tracks, lift towers and stairs at each end, and a canopy over the full length of the bridge deck.

    Constraint
    One platform is 3.2 m wide and cannot be narrowed; the lift tower on that side must sit within the existing platform width without reducing the safe standing area.
    Ground and site
    Made ground to 3 m over stiff clay on both sides of the track.
  • School sports pavilion with a cantilevered viewing deck

    building

    A two-storey pavilion with changing rooms at ground floor and a clubroom above, incorporating a 4.5 m cantilevered viewing deck along the pitch elevation for 80 spectators.

    Constraint
    The pitch side of the building sits 2.0 m from a mature protected oak, whose root protection area extends 8 m from the trunk and within which no excavation is permitted.
    Ground and site
    Firm shrinkable clay, plasticity index 42. Water table below 6 m.
  • Covered market hall replacing a fire-damaged structure

    civic

    A single-storey covered market of 55 m × 35 m with a clear span across the width, natural ventilation at ridge level, and forty trading units served by a service road along one side.

    Constraint
    The existing perimeter masonry walls survived the fire and are to be retained for their street frontage, but may carry only vertical load from the new roof — no horizontal thrust.
    Ground and site
    Made ground to 2.5 m over firm clay. Existing strip footings under the retained walls at 1.5 m.
    Reuse opportunity
    Retaining the perimeter walls is the low-carbon and heritage option.
  • Waste transfer building with an internal pushing wall

    industrial

    A 60 m × 40 m waste transfer building with 6 m high reinforced concrete push walls forming three internal bays, a 16 m clear internal height, and a fully enclosed envelope for odour control.

    Constraint
    Loading shovels impact the push walls; the client requires the walls to be designed for a 25 tonne machine pushing material at working speed.
    Ground and site
    Firm clay, allowable bearing pressure 130 kN/m² at 1.5 m.
  • Cycle and pedestrian bridge over a river with flood constraints

    bridge

    A 44 m clear span cycle and pedestrian bridge over a river, deck width 4.0 m, with soffit level at least 600 mm above the 1 in 100 year flood level plus climate allowance.

    Constraint
    The environmental regulator will permit no piers or foundations within the channel or within 8 m of either bank top.
    Ground and site
    Alluvial silt to 7 m over dense gravel. Bank tops 12 m apart at the narrowest point.
  • Hotel over an existing retail unit

    building

    A five-storey, 90-bedroom hotel constructed over an existing single-storey retail unit that must continue trading, with a transfer structure above the retail roof and a new independent entrance.

    Constraint
    The retail unit trades seven days a week and its structure is not to be loaded. All new vertical structure must land outside the existing footprint or through a small number of penetrations agreed at fixed positions.
    Ground and site
    Stiff clay from 1.5 m, allowable bearing pressure 175 kN/m².
  • Crematorium chapel with a long-span timber roof

    civic

    A single-storey chapel seating 150, requiring a 20 m clear span, a 7.0 m internal height at the ridge, and an exposed structural roof as an architectural feature. Adjoining single-storey ancillary accommodation.

    Constraint
    The client requires an exposed structure with a design life of 60 years and no visible steelwork within the chapel volume.
    Ground and site
    Firm sandy clay, allowable bearing pressure 140 kN/m² at 1.2 m.
  • Slipway and boat hoist foundation

    marine

    A slipway 30 m long at 1 in 8 with a boat hoist capable of lifting 40 tonnes, running on rails either side of a haul-out dock, and a hardstanding area for eight boats under repair.

    Constraint
    The hoist must operate at all tide states, and the rails cannot tolerate differential settlement greater than 15 mm over their length.
    Ground and site
    Soft marine clay to 8 m over dense sand. Tidal range 3.8 m.
  • Nursery school with a shallow-founded lightweight structure

    building

    A single-storey nursery of 800 m² on a greenfield edge-of-town site, with a 12 m clear span hall, and a requirement for a low-carbon structure and a 60-year design life.

    Constraint
    The site is in a flood zone requiring finished floor level 900 mm above existing ground, and no fill may be imported to raise the site.
    Ground and site
    Soft alluvial clay to 4 m over firm clay. Groundwater at 0.8 m.
    Reuse opportunity
    The brief invites a low-carbon structure; material efficiency should be visible in the scheme choice, not only in the specification.
  • Workshop with an overhead travelling crane

    industrial

    A 24 m span single-bay workshop, 72 m long, with a 20 tonne overhead travelling crane at 8.0 m rail level, 10 m clear height to underside of roof structure, and full-height doors at both ends.

    Constraint
    Crane deflection limits require the gantry girder deflection under vertical crane load to be no more than span over 750, and the frame sway under crane surge to be limited accordingly.
    Ground and site
    Medium dense sand, allowable bearing pressure 180 kN/m² at 1.5 m.
  • Park-and-ride terminal building and canopy

    transport

    A terminal building of 450 m² with a waiting hall, and a separate canopy 90 m long covering a bus lay-by and pedestrian route, with integrated lighting and a rainwater harvesting system feeding a below-ground tank.

    Constraint
    A 33 kV buried cable runs the length of the site 2.5 m from the canopy centreline at 1.1 m depth, with a 3 m no-dig easement either side.
    Ground and site
    Firm clay, allowable bearing pressure 150 kN/m² at 1.5 m.
  • Department store converted to offices and residential

    refurbishment

    Convert a 1970s five-storey reinforced concrete department store to offices at levels one and two and residential above, forming two lightwells through the existing floor plates and adding a new stair core.

    Constraint
    The existing flat slab is 275 mm thick on a 7.5 m grid with drop panels. Forming lightwells removes slab in the vicinity of columns.
    Ground and site
    Existing pad foundations at 2.2 m on dense gravel; original design drawings available, calculations are not.
    Reuse opportunity
    Retention of the frame and slabs is the carbon case; each opening has to be justified individually.
  • Emergency services station with a training tower

    civic

    A two-storey fire and rescue station with appliance bays at ground floor requiring 6.0 m clear height and 5.5 m wide doors, accommodation above, and a detached four-storey training tower for ladder and rope work.

    Constraint
    The appliance bay doors must give a clear opening with no columns between them along a 28 m elevation, and appliances must be able to leave within 90 seconds of a call.
    Ground and site
    Made ground to 1.8 m over dense gravel, allowable bearing pressure 250 kN/m² at 2.5 m.

Every brief is original to Queensferry. None is taken from or adapted from an IStructE paper, an examiners’ report, a published worked answer or a commercial course, and no examination drawing has been traced.

Everything here is stored in this browser only. Nothing is uploaded, nothing is analysed, and clearing your browser data will delete it — so export anything you want to keep.

What is in the bank

Every brief carries a constraint chosen so that two genuinely distinct schemes are possible — which is the part of section 1a that most marks turn on.
PaperBriefsWhat they cover
Chartered Membership35Buildings, bridges, industrial, civic, transport, marine and refurbishment
Incorporated-Membership20Single-scheme problems at a scale suited to the paper
IM–CM supplementary12Two-scheme problems where the constraint drives the difference
Energy question10Wind, storage, solar, biomass, hydrogen, substation, hydro and nuclear-site work

Every brief carries a constraint chosen so that two genuinely distinct schemes are possible — which is the part of section 1a that most marks turn on.

Three ways to use one brief

  1. 01

    Twenty minutes — schemes only

    Two outline schemes and a stability sketch for each. Do this often. It is the cheapest practice available and it drills the part of the paper carrying the most marks.

  2. 02

    Ninety minutes — through to a recommendation

    Schemes, appraisal against criteria drawn from the brief, and a recommendation in one unambiguous sentence. That is the whole of section 1a.

  3. 03

    A full day — the complete paper

    Use the mock examination tool, which draws a brief you have not seen and runs the correct clock for your paper.

Getting value from the bank

Worth doing

  • Rotate the building type — practise what you do not design at work
  • Read the constraint twice before choosing a scheme
  • Write down the six difference categories and change three or four of them
  • Open the difficulty note only after your attempt
  • Keep your attempts, so you can see whether the same weakness recurs

Avoid

  • Read the difficulty note first
  • Only practise briefs in your own sector
  • Skip the stability sketch because it is obvious
  • Treat a brief as a reading exercise

Related pages and tools

Read the official guidance